API 570 Question Bank (API 570 QB001)

20) What is the best thing to do with deadlegs that are no longer in service?
a) Ultrasonically inspect often
b) Radiograph often
c) Inspect often
d) Remove them

21) What are the most common forms of corrosion under insulation (CUI).
a) Localised corrosion of non-ferrous metals and chloride stress corrosion cracking of carbon steel.
b) Localised corrosion of chrome-moly steel and chloride stress corrosion cracking of ferritic stainless steel.
c) Localised corrosion of carbon steel and chloride stress corrosion cracking of austenitic stainless steel
d) Localised corrosion of nickel-silicon alloy and caustic stress corrosion of austenitic stainless steel

22) What climatic area may require a very active program for corrosion under insulation?
a) Cooler northern continent locations.
b) Cooler direr, mid-continent locations
c) Warmer, marine locations
d) Warmer drier, desert locations

23) Certain areas and types of piping systems are potentially more susceptible to corrosion under insulation. Which of the items listed is not susceptible to CUI?
a) Areas exposed to mist over-spray from cooling water towers.
b) Carbon steel piping systems that normally operate in-service above 250 degrees but are in intermittent service.
c) Deadlegs and attachments that protrude from insulated piping and operate at a different temperature than the temperature of the active line.
d) Carbon steel piping systems, operating between 250 degrees F and 600 degrees F.

24) What location is subject to corrosion under insulation and inspection contributes to it?
a) Locations where pipe hangers and other supports exist.
b) Locations where insulator has been stripped to permit inspection of the piping.
c) Locations where insulation plugs have been removed to permit piping thickness measurements.
d) Locations where there is damaged or missing insulation jacketing.
visit again for more.........

Monday, August 6, 2012

API 570 Question Bank (API 570 QB001)

15) Select thickness measurement locations (TMLs) within injection point circuits subjected to localised corrosion according to the following guidelines. Select the one that does not belong.
a) Establish TMLs on appropriate fittings within the injection point circuit.
b) Establish at least one TML at a location at least 25 feet beyond the downstream limit of the injection point.
c) Establish TMLs on the pipe wall at location of expected pipe wall impingement or injected fluid.
d) Establish TMLs at both the upstream and downstream limits of the injection point circuit.

16) What are the preferred methods of inspecting injection points ?
a) Radiography and / or ultrasonics
b) Hammer test and / or radiograph
c) Ultrasonics and / or liquid penetrant
d) Liquid penetrant and / or eddy current.

17) During periodic scheduled inspections, more extensive inspection should be applied to an area beginning __________ upstream of the injection nozzle and continuing for at least __________ pipe diameters downstream of the injection point.
a) 10 inches, 20
b) 12 feet, 10
c) 12 inches, 10
d) 10 feet, 10

18) Why should deadlegs in piping be inspected?
a) API 510 mandates the inspection of deadlegs
b) Acid products and debris build up in deadlegs
c) The corrosion rate in deadlegs can vary significantly from adjacent active piping.
d) Caustic products and debris build up in deadlegs.

19) Both the stagnant end and the connection to an active line of a deadleg should be monitored. In a hot piping system, why does the high point of a deadleg corrode and need to be inspected?
a) Corrosion occurs due to directed currents set up in the deadleg
b) Erosion occurs due to convective currents set up in the deadleg.
c) Corrosion occurs due to convective currents set up in the deadleg
d) Erosion occurs due to directed currents et up in the deadleg
visit again for more.............

Sunday, August 5, 2012

API 570 Question Bank (API 570 QB001)

today questions is here.............
10) An RBI assessment can be used to alter the inspection strategy provided:
a) The degradation methods are identified
b) The RBI is fully documented.
c) A third party conducts the RBI
d) Both A and B above

11) Which one of the following is not a specific type of an area of deterioration?
a) Rectifier performance
b) Injection points
c) Deadlegs
d) Environmental cracking

12) Injection points subject to accelerated or localised corrosion may be treated as __________.
a) The focal point of an inspection circuit
b) Separate inspection circuits
c) Piping that must be renewed on a regular schedule
d) Locations where corrosion inhibitors must be used

13) The recommended upstream limit of inspection of an injection point is a minimum of:
a) 12 feet or 3 pipe lengths whichever is smaller
b) 12 inches or 3 pipe diameters whichever is smaller
c) 12 inches or 3 pipe diameters whichever is greater
d) 12 feet or 3 pipe lengths which is greater

14) The recommended downstream limit of inspection of an injection point is a minimum of
a) Second change in flow direction past the injection point, or 25 feet beyond the first change in flow direction whichever is less
b) Second change in flow direction past the injection point, or 25 feet beyond the first change in flow direction whichever is greater
c) Second change in flow direction past the injection point, or 25 inches beyond the first change in flow direction whichever is less
d) Second change in flow direction past the injection point, or 25 inches beyond the first change in flow direction whichever is greater.